Job Detail

  1. Home
  2. A&P
  3. Job detail

B1&B1 Line Maintenance For B737 Max

  • Job typeJob type: Onsite
  • Job Duration01 to 03 months
  • Project LevelMedium Level
  • Project deadlineExpired
  • //freelancer.avieso.com/wp-content/uploads/2021/12/great-britain.pngUnited Kingdom

Project detail

The Maintenance Engineer will report directly to the respective shift assigned Engineering Team Manager with a dotted line to the Senior Maintenance Engineer for daily priorities. The Maintenance Engineer will provide first response to engineering fault conditions, both reactive and planned maintenance activities as well as being involved in continuous improvement projects within our start of the art automated Customer Fulfillment Center (CFC).

Daily Maintenance Engineer roles may involve:

  • Carrying out electrical and mechanical planned maintenance across the site in an accurate, timely and safe manner.
  • Update records of work activities, tasks carried out, parts used through stores and training given.
  • Perform assembly and sub-assembly repairs by following written work instructions, blueprints and schematics.
  • Respond to and diagnose equipment breakdowns, resolving issues and action repairs
  • Perform daily housekeeping and cleaning duties of equipment.
  • Analyze data to find solutions to improve MHE performance, providing reports where necessary.
  • Complete quality inspections to ensure work is completed to a safe standard.

The Maintenance Engineer may be asked to perform tasks as required by management deemed as a reasonable request. This job description is a summary of the typical functions of the role, not an exhaustive or comprehensive list of possible role responsibilities, tasks and duties and is subject to review. The responsibilities, tasks and duties of the job holder might differ from those outlined in the job description and other duties, as assigned, might form part of the job.

 Lot 39 Anmatjere NT 0872 Australia
 Get Directions

Project frequently asked questions

Freelancer type required for this project

Attachments

Project Completion deadline

September 1, 2022
Select your currency
USD United States (US) dollar